Office Progress – ORC Week 6

It’s Week 6 of the One Room Challenge…Only 2 weeks to go! Surprisingly, I actually have some office progress to share today…we may just make it after all.

Hexagon Tile Installed and Grouted

It only took 15 hours to install all the hexagon tiles and grout the whole floor. I love how it turned out!

This was the first floor that I’ve ever tiled and I made sure each tile was level with the tiles next to it. This made grouting so much easier and faster!

Office Progress – Final Tiles being installed

Not only did I finish the floor, I was also able to install the two small side cabinets and the countertop in between.

Office Progress – Finished Floors

We painted the walls Sherwin-Williams color Repose Gray and the window trim with Benjamin Moore Advance Paint.

There’s still a ton to do (build the bookcases, paint the built ins, install hardware, hang the curtains, wire the lights, add baseboards, etc), but I couldn’t help myself and had to start styling one of the corners.

Reading Nook

This table, chair, and hexagon pattern pillow creates a perfect little reading nook!

2 weeks to go! Wish me luck and don’t forget to check out the other participants in the One Room Challenge.

Hexagon Tile Floor – ORC Week 4

We are officially half way done with the Fall One Room Challenge! Based on that fact, you would think I would have the major components of the room done…or even started. But if you’ve been here a while, you know better.

At the end of last week, my only progress was cutting my countertop down and adding the Ditra XL to the floors in preparation of tiling.

Week 3 Progress – Ditra Install

While this week’s progress isn’t amazing, it still is forward momentum, especially considering that I’ve never installed a tile floor before. Most of it was done after the kids went to bed by the glow of a work light and warmth of a ceramic heater as we didn’t have power or heat.

To get started, I dry fitted some tiles to see where I wanted the cuts to be. I had been debating on where the tile should end, but once I marked where the doors would go, I realized I could have a full tile when I walked in and on the opposite back wall.

Dry Fitting the Hexagon Tile Floor

Once I figured out the placement from entry to the back wall, I found the center of the back wall and the the doorway and marked them. I also marked the center of my first tile and laid it. I used my laser to make sure that my first tiles were lining up straight with the doorway.

Installing the First Hexagon Floor Tiles

You wouldn’t believe how long these six tile took me to lay. I utilized the QEP LASH Flat Floor Leveling System (it’s two parts and a tool) to make sure my tile were evenly spaced and level which I verified with my small level.

Installing the Hexagon Floor Tiles

I decided to install all the whole tiles and fill in the cuts later on. I completely lucked out and a whole tile fit perfectly in front of the cabinets. I’m pretty sure I couldn’t get that lucky again.

Between the construction crew working on the nearby basement stairs and the front porch, I wasn’t able to work on the floor as much as I would have liked. I made it about 2/3s of the way done with the whole tiles and will be wrapping up the rest of the floor this upcoming week.

End of Week 4 Tile Progress – Installed Hexagon Floor Tiles

If you also follow along on Instagram (@boxwoodathome), you saw that I also made some purchases for the room! I’ll show you those next week!

Dont forget to check out the other amazing transformations here.